Production release deployment strategies
The five deployment strategies for software delivery:
1. Blue/Green Deployment:
• Two environments: Blue (current, active) and Green (new version).
• Traffic is switched to the Green environment after deployment and testing.
• The Blue environment acts as a fallback if issues occur.
2. Canary Deployment:
• New version is rolled out gradually.
• A small percentage of traffic (e.g., 25%) is initially sent to the new version.
• Once stable, more traffic is routed to the new version (e.g., 75%).
3. A/B Testing:
• Two versions (e.g., V1 and V2) run simultaneously for different user groups.
• Helps determine which version performs better based on user feedback or metrics.
4. Feature Flag:
• Feature toggles control new features.
• New features can be enabled for specific users (e.g., 20%) without deploying new code.
5. Rolling Deployment:
• New version is rolled out in stages (e.g., Stage 0 to Stage 3).
• Gradually replaces instances of the old version without downtime.
No comments:
Post a Comment